In a flat the plumber works on your branch beyond the valves, and touches the riser only after agreeing with the building manager. In a wooden house with its own incoming supply, the whole stretch from the meter pit to the last tap is usually the owner's responsibility.
Where your pipes end: the riser, the valve, the meter pit
The Apartment Ownership Law counts the utility lines up to the common-property risers as part of the flat. In practice this means: the pipes from the riser branch through the valves and meters to the sink, the bath and the washing machine are yours, and can be replaced without a decision of the flat owners' association. The riser and its connection are part of the building, so work that touches it is agreed with the building manager.
In Pārdaugava, Riga's left bank, pre-war brick buildings, Soviet-era series blocks and new developments stand side by side in one street. Āgenskalna priedes, the first large Soviet residential estate in Riga, was built in 1958–1962, and flats in such buildings often still have the original steel pipes. Once the zinc wears away on galvanised steel, rust builds up inside, the pipe narrows, the pressure falls and the water turns brownish.
In wooden houses in Āgenskalns, Torņakalns and Zasulauks, pipes tend to run along outer walls and through an unheated basement. The building code requires rooms with cold water pipes to be kept above 2 °C or the pipes to be protected from frost. The responsibility of Rīgas ūdens usually ends at the outer wall of the meter pit or at the plot boundary; the stretch in the yard up to the house and everything in the house is the owner's responsibility.
Apartment Ownership Law, Sections 3 and 11. Riga City Council binding regulations No. 17, clause 3: the Rīgas ūdens network reaches the outer wall of the commercial metering inspection chamber (1.5–2 m from the street's red line) or the plot boundary. LBN 221-15, clause 109: rooms with cold water pipes above 2 °C. Checked 16.11.2026.
Pipe jobs and starting prices
| Situation | What the plumber does | Price |
|---|---|---|
| A joint or a short section drips where it is accessible | fixes the leak: a gasket, a joint or a short piece of pipe | from €40 |
| A new outlet is needed for a sink, washing machine or water heater | builds one cold or hot water point up to the appliance | from €35 |
| Replacing old steel pipes in a flat or wooden house | new pipes with fixings along the wall or in the floor | from €10/m |
| A rusted riser section on your floor | once the building manager agrees, replaces the section on one floor | from €110 |
| A valve will not close or drips at the stem | replaces the valve; the first one after the riser needs the riser shut off | from €25/h |
| The water is brownish, the pressure falls, the cause is not clear | call-out: arrival, inspection and finding the cause | from €40 |
The price is set by the length and the place of the pipes. Pipes on top of the finish are faster to replace than those hidden in a wall, because chasing and restoring the finish are separate work. The number of points and whether the riser has to be shut off also matter. This is the labour price; materials are extra. If there is a travel charge, it is stated on the call before the work.
Installing pipes: which pipe to fit in place of old steel
In flats, plastic pipes are usually fitted in place of old steel: multilayer (with an aluminium layer), PEX or polypropylene. They differ in how much they expand in hot water. For ordinary polypropylene pipe the manufacturer aquatherm states 0.15 mm per metre per degree and advises compensation after as little as 10 m of straight run, while Uponor states 0.025 mm for its multilayer pipe, about six times less than PEX.
In a small Soviet-era bathroom a hot water pipe along the wall therefore needs room to expand. The building code requires a flat's pipes and fittings to be chosen for a working pressure of at least 600 kPa.
Expansion: aquatherm blue installation principles; Uponor MLC product information. LBN 221-15, clause 117 (600 kPa). Checked 13.11.2026.
Replacing valves: when the old valve no longer shuts off the water
A valve that has not been closed for years is often stuck: the handle does not turn, or water leaks past it even when closed. It is worth testing before an emergency, by closing the valve and opening it again.
A valve after the meter or at the washing machine is replaced by closing the flat's main valve. The first valve directly after the riser is different: to unscrew it the whole riser has to be shut off, and then the neighbours are without water too. The time is agreed with the building manager.
Pipes rumble or hum when a tap is turned
Noise in pipes is usually a sign that somewhere the water has too narrow a passage or too much pressure. The most common causes in a flat:
- a valve is open only partly, and the water squeezes through it with a whistle;
- a worn gasket in a tap or valve starts to vibrate;
- after the riser was shut off, air is left in the pipes and comes out with knocking;
- a pipe is not fixed and bangs against the wall when the washing machine closes its valve sharply;
- the pressure in the building is high.
Under LBN 221-15, the pressure at the lowest water draw-off point must not exceed 6 bar. Where the pressure is higher, a pressure reducer after the incoming valve helps: it keeps the outlet pressure steady and reduces flow noise. In a block of flats, high pressure is the building manager's matter; in a private or wooden house the owner fits the reducer.
LBN 221-15, clause 35: pressure at the lowest point up to 0.6 MPa (6 bar). Reducer operation per EN 806-2: Resideo Braukmann D04FM specification. Checked 13.11.2026.
Pressure testing pipes before the box is closed
For a new water supply system the building code requires a pressure test, flushing with drinking water and, if needed, disinfection. The test pressure is stated in the design, or taken from the standard LVS EN 806-4. The standard advises a pressure 1.1 times the maximum design pressure, for example 8.25 bar if the working pressure is 5 bar.
Manufacturers state their own procedure. For its pipes Uponor states a water test in two stages: first 11 bar held for 30 minutes without the pressure falling, then 5.5 bar for 120 minutes. In a flat it is worth doing while the pipes are still visible, before they are boxed in with plasterboard or tiled over.
LBN 221-15, clause 13.1; WRAS explanation of EN 806 (1.1 x MDP); Uponor pressure test report 1120604. Checked 13.11.2026.
Before the plumber comes: valves, the box and the neighbours
- Check that the flat's valves close, and note down any that do not turn.
- If the riser has to be touched, agree the shut-off time with the building manager and warn the neighbours above and below.
- Clear access to the riser box, the hatch, the sink cupboard and the space behind the washing machine.
- In a wooden house, show the way to the basement and the meter pit; in winter, clear the snow off the pit cover.
- In the form, describe the pipe material and length and attach a photo.
Risers, wooden houses and prices
If the riser itself is rusted, see riser replacement in a flat, and who decides on it is described in the guide who pays for riser replacement. An old wooden house has its own guide: plumbing in an old wooden house. If a pipe is already leaking, see the emergency plumber. All starting prices are on the page prices. We also replace pipes in Torņakalns, Zasulauks and Ķīpsala.
Sources
- Flat elements up to the common-property risers (Section 3); work without approval as far as it does not affect common property (Section 11) checked 16 November 2026
- Boundary of the Rīgas ūdens network (binding regulations No. 17, clause 3) checked 16 November 2026
- Āgenskalna priedes built in 1958–1962 checked 16 November 2026
- Corrosion of galvanised steel pipes, low pressure and brown water checked 13 November 2026
- LBN 221-15: pressure up to 6 bar (clause 35), 600 kPa (clause 117), rooms above 2 °C (clause 109), pressure test (clause 13.1) checked 13 November 2026
- PP-R expansion 0.15 mm/(m·K), compensation after 10 m checked 13 November 2026
- Multilayer pipe expansion 0.025 mm/(m·K) checked 13 November 2026
- A pressure reducer reduces flow noise (EN 806-2) checked 13 November 2026
- EN 806 test pressure 1.1 x MDP checked 13 November 2026
- Uponor test: 11 bar 30 min, 5.5 bar 120 min checked 13 November 2026
- Pipes are insulated without gaps at bends and valves; thawed without a flame checked 13 November 2026